Betriebsstellen/en: Unterschied zwischen den Versionen
Keine Bearbeitungszusammenfassung |
Keine Bearbeitungszusammenfassung |
||
| Zeile 15: | Zeile 15: | ||
Les services peuvent être classés en deux catégories, bien que ceci ne soit pas écrit dans le manuel officiel. | Les services peuvent être classés en deux catégories, bien que ceci ne soit pas écrit dans le manuel officiel. | ||
''' | Les '''Services actifs''' déplacent les trains au sein du service même. En plus du canton où les opérations de couplage ou de découplage ont lieu (en rouge), ces services nécessitent des cantons additionnels. | ||
'''Passive operating points''' only intervene in the ongoing train operation in a controlling or regulating manner or operate locomotive functions (e.g. tunnels). | '''Passive operating points''' only intervene in the ongoing train operation in a controlling or regulating manner or operate locomotive functions (e.g. tunnels). | ||
Version vom 15. Januar 2025, 18:47 Uhr
Services
Deux types de services
Les services peuvent être classés en deux catégories, bien que ceci ne soit pas écrit dans le manuel officiel.
Les Services actifs déplacent les trains au sein du service même. En plus du canton où les opérations de couplage ou de découplage ont lieu (en rouge), ces services nécessitent des cantons additionnels.
Passive operating points only intervene in the ongoing train operation in a controlling or regulating manner or operate locomotive functions (e.g. tunnels).
Active operating points
- Shadow station
- Locomotive shed
- Shuttle track
- Locomotive change
- Pushing operation
- Shut-off hump
Passive operating points
- Station
- Single-track line
- Single-track operation
- Slow speed section
- Tunnel
- Junction
- Exit
- Siding point
- Shunting area
- Storage area
- Quantity control
- Booster
- Display case
Prerequisite
A fully configured block is required so that the first train arriving can stop at the desired location.
Special marking
The special marking is used at some operating points. This is always required when a second train or a second locomotive is to enter a block that has already been reserved (by other vehicles).
Download instructions
It is stated in the document: TC10Gold Alle Betriebsstellen.pdf each operating location is discussed individually.
This document also includes a TC file. Archive (Zip file): Projekt TC10B1 alle BS V3.zip
Weblinks
- Source: Forum
- Directions: TC10Gold Alle Betriebsstellen.pdf
- Sample file: Projekt TC10B1 alle BS V3.zip
- -- Silvio Richter 19. Dez. 2023 (UTC)
- bearbeitet: Uslex (Diskussion) 07:49, 20. Dez. 2023 (UTC)