Betriebsstellen/en: Unterschied zwischen den Versionen

Aus RailRoad&Co.-Wiki
Zur Navigation springenZur Suche springen
Die Seite wurde neu angelegt: „*Shadow station *Locomotive shed *Shuttle track *Locomotive change *Pushing operation *Shut-off hump“
Die Seite wurde neu angelegt: „The special marking is used at some operating points. This is always required when a second train or a second locomotive is to enter a block that has already been reserved (by other vehicles).“
Zeile 54: Zeile 54:
:''Fig: Block Schattenbahnhof''
:''Fig: Block Schattenbahnhof''


<div lang="de" dir="ltr" class="mw-content-ltr">
<span id="Spezialmarkierung"></span>
=== Spezialmarkierung ===
=== Special marking ===
</div>


<div lang="de" dir="ltr" class="mw-content-ltr">
The special marking is used at some operating points.
Die Spezialmarkierung wird bei einigen Betriebsstellen genutzt.
This is always required when a second train or a second locomotive is to enter a block that has already been
Diese wird immer dann benötigt, wenn ein zweiter Zug oder eine zweite Lok in einen bereits
reserved (by other vehicles).
(von anderen Fahrzeugen) reservierten Block einfahren soll.
</div>


:[[Datei:Spezialmarkierung.png|400px]]
:[[Datei:Spezialmarkierung.png|400px]]
:<div lang="de" dir="ltr" class="mw-content-ltr">
:''Fig: Special marking''
''Abb: Spezialmarkierung''
</div>


<div lang="de" dir="ltr" class="mw-content-ltr">
<div lang="de" dir="ltr" class="mw-content-ltr">

Version vom 15. Januar 2025, 15:35 Uhr

Verwendung
thumbs


Operating locations

Two categories of operating locations

Fig: Operating points

The operating points can be divided into two categories, even if this is not stated in the official documentation.

Active operating points move the trains within the operating point itself. In addition to the block in which coupling (uncoupling) takes place (marked in red), these require additional blocks.

Passive operating points only intervene in the ongoing train operation in a controlling or regulating manner or operate locomotive functions (e.g. tunnels).

Active operating points

  • Shadow station
  • Locomotive shed
  • Shuttle track
  • Locomotive change
  • Pushing operation
  • Shut-off hump

Passive operating points

  • Station
  • Single-track line
  • Single-track operation
  • Slow speed section
  • Tunnel
  • Junction
  • Exit
  • Siding point
  • Shunting area
  • Storage area
  • Quantity control
  • Booster
  • Display case

Prerequisite

A fully configured block is required so that the first train arriving can stop at the desired location.

Fig: Block Schattenbahnhof

Special marking

The special marking is used at some operating points. This is always required when a second train or a second locomotive is to enter a block that has already been reserved (by other vehicles).

Fig: Special marking

Anleitung herunterladen

Es wird im Dokument:

TC10Gold Alle Betriebsstellen.pdf

auf jede Betriebsstelle einzeln eingegangen.

Zu diesem Dokument gehört auch eine TC-Datei. Archiv (Zip-Datei): Projekt TC10B1 alle BS V3.zip

  • Quelle:

Forum

*Anleitung: TC10Gold Alle Betriebsstellen.pdf *Musterdatei: Projekt TC10B1 alle BS V3.zip


-- Silvio Richter 19. Dez. 2023 (UTC)
bearbeitet: Uslex (Diskussion) 07:49, 20. Dez. 2023 (UTC)