Translations:Zugidentifikation/10/en

Aus RailRoad&Co.-Wiki
Version vom 1. Januar 2026, 17:10 Uhr von Uslex (Diskussion | Beiträge) (Die Seite wurde neu angelegt: „*The current block remains current until the train is detected in another block, i.e., via train tracking, manual shunting, or train identification in another block. *A departure from the block reported via train identification is irrelevant to TrainController and is not even reported by a number of train identification systems.“)
(Unterschied) ← Nächstältere Version | Aktuelle Version (Unterschied) | Nächstjüngere Version → (Unterschied)
Zur Navigation springenZur Suche springen
  • The current block remains current until the train is detected in another block, i.e., via train tracking, manual shunting, or train identification in another block.
  • A departure from the block reported via train identification is irrelevant to TrainController and is not even reported by a number of train identification systems.